BIM Estimating
What is the "BIM Duration" and who is needed for how long?
What is the relationship between the size of the project and BIM Estimate?
What are the BIM Deliverables for Drywall and Framing contractor?
Are shop drawings included? What must they have at minimum?
How much BIM time to account for "Pre-construction" and "Construction" phases?
How to keep track of all the changes during Pre-Construction and what are their cost impacts?